Budget of the designed intervention
It is the document that estimates the cost of the designed structural intervention.
The budget of the designed intervention is an essential element to ensure that the rehabilitation is carried out within the budget. The budget must be accurate, transparent and flexible.
Applied Science and Research
Code, Norms, Regulations, and Performance Consultancy
Advanced Structural Analysis
- Monitoring / structural health
- Monitoring to identify current status and performance of the structural intervention
- Field and office research work
- Specific and specialized knowledge in material design and execution
- Structural Rehabilitation Design
- Temporary load bearing shoring design
- Material selection
- Selection of the method and design of the technique to rehabilitate, repair, strengthen and protect a reinforced concrete or metallic structure
- Design for corrosion control and protection
- Design and specification for reinforcing structures with FRP composite materials
- Budget of the designed intervention